The Process
From Project Data to Permit-Ready Drawing Set
Monterra uses a structured four-step process to take your project intake data and produce a complete commercial electrical drawing package. No manual drafting. No template configuration. No format hunting.
4 hrs
Typical time from intake submission to complete drawing set delivery
7 sheets
Average number of drawings in a complete commercial electrical permit package
1 pass
All drawings generated from a single intake submission, not incrementally
1
Intake Validated
Project parameters verified. 14 inputs confirmed.
2
Load Calculations Running
NEC 220.87 demand factor applied. Service sizing complete.
3
Diagrams Assembling
Single-line, riser, and panel schedules being built.
4
Drawing Set Complete
7 sheets ready for PE review. Estimated 3h 52m.
Common Questions
Questions About the Process
Try It Now
See the Full Process on Your First Project
The free trial generates one complete drawing set. Submit an intake, watch the generation run, and review the output before you commit to a subscription.